Sprint Pointer
  • الرئيسية
  • الدورات
  • المدونة
  • About Us
  • تواصل معنا
  • +1 (650) 555-0111
  • الْعَرَبيّة English (US)
  • تسجيل الدخول
  • تواصل معنا
Sprint Pointer
    • الرئيسية
    • الدورات
    • المدونة
    • About Us
    • تواصل معنا
  • +1 (650) 555-0111
  • تسجيل الدخول
  • الْعَرَبيّة English (US)
  • تواصل معنا
السفر
نصائح العطلة
 
Agile, Waterfall, Iterative and Incremental Approaches
Hammam
Agile, Waterfall, Iterative and Incremental Approaches
Introductioon When Project management body of knowledge PMBOK guide illustrates on the project management development approaches PMD, it categorised into 5 different methods which are: traditional, it...
04‏/09‏/2025
Why should we develop an emergency procedure?
Hammam
Why should we develop an emergency procedure?
Introduction At workplaces, incidents and accidents might happen at any time, due to unsafe acts or unsafe conditions, and we all believe we cannot control the workplace by 100%, there is always some ...
03‏/09‏/2025
Inputs to the health and safety management performance review
Hammam
Inputs to the health and safety management performance review
Inputs to the health and safety management performance review by Hammam M. Elmahi Introduction: Occupational safety and health (OSH) review is defined by Goetsch (2019) as a systematic evaluation of w...
22‏/08‏/2025
تابعنا

Ghubra, Muscat • Oman

  • hamam_training@outlook.com


حقوق النشر واسم الشركة
الْعَرَبيّة | English (US)
مشغل بواسطة أودو - إنشاء موقع إلكتروني مجاني